01Quality
Process and QC
We close the body with hand glue in two passes, then finish the deck by hand.
02The body
Two passes of hand glue close the body.
We close the body with hand glue in two passes, then finish the deck by hand. It is a slower build than a fully welded shell, and it is the one we run.
- 01Pass 1 · seam assembly
- 02Pass 2 · deck finishing
03Heat weld
The welder runs on fittings, not on the body.
Our heat welder runs on D-ring pads, paddle clips, handle bases and fin boxes. The board body itself does not go through it.
- D-ring pads
- Paddle clips
- Handle bases
- Fin boxes
04QC flow
Sixty hours between the last seam and the box.
Every seam gets a 100% soap spray test, then 24 hours of rest for a second check. Deck work adds 24 hours of curing, and packing waits another 12.
- 01 100% soap spray
- 02 24 h rest
- 03 24 h cure
- 04 12 h before packing
05Leak rack
Five inspectors walk the rack and pull any board that loses pressure.
- 5QC inspectors
- 100%Seams sprayed