01Resources
Buyer resources
Buyers ask us four things first, so they sit on this page.
02Lead times
A sample takes 10 to 15 days and a production run takes 45 days.
| Sample | 10–15 days |
|---|---|
| Production | 45 days |
03In the box
Every board ships with eight items in the box.
| 01 | Backpack |
|---|---|
| 02 | Pump |
| 03 | Paddle |
| 04 | Leash |
| 05 | Fin |
| 06 | Phone pouch |
| 07 | Dry bag |
| 08 | Repair kit |
04Markets
Europe asks for paperwork. The US asks about the vessel rule.
Europe asks for REACH and GPSR paperwork; the US treats a board outside a swimming area as a vessel.
| EU | REACH and GPSR paperwork |
|---|---|
| US | Vessel rule outside swimming areas |
05 · Brief
Fill the six fields and your brief is ready to send.
This form sends your brief straight to the plant inbox. We reply within one business day.